Our Success Stories

Supplying and installing 28,000 cubic meters of cold storage, four 150 HP screw compressors and 2 evaporative condensers. 
Supplying and installing 5,000 cubic meters of refrigerated warehouse space and installing ammonia recirculated evaporators for an important finished products warehouse.
Responsible for controlling as well as the steam, chilled water and hot water in pasteurization plants.
Supplying and installation of 5,000 cubic meters of refrigerated warehouse space as well as the installation of the ammonia flooded evaporation system in some Nestle industries.
Installing the coolers and refrigeration systems for the kitchens of The Paradisus Hotel and Resort.
Responsible for the supplying and installation of  air conditioning equipment with 700 Tons of capacity, air distribution and ventilation in a Trauma Hospital.
Installing 190 tons of air conditioning for the presidential offices on the entire third floor of this building.
Marriott Renaissance Sustainable Chiller Replacement Project.
Installating the reverse osmosis plant for a manufacturing Facilities.